As an indicative guide, published ranges for a plain grey concrete driveway supplied and laid across the Sunshine Coast run roughly $73 to $145 per square metre in 2026 (What's the Damage, October 2026, GST included), with coloured, stencilled and exposed aggregate finishes sitting higher. Those are published market figures to help you read a quote, not a price from us, and the real number for your block depends on the ground, the access and the finish.
Concreting is one of those jobs where a per-square-metre rate on a website is close to useless on its own. Two driveways of identical size on the same street can be very different builds once you factor in what is underneath and how the truck gets to the pour. What follows is an honest breakdown of the ranges you will see quoted around the Coast, and the things that push a quote up or down.
Ready to move from price research to a site quote? See our concrete driveway installation on the Sunshine Coast service page for new pours, replacement and widening.
Sunshine Coast concrete prices at a glance
For driveway work, the finish is the clearest starting point: plain grey sits at the lower end, coloured and stencilled concrete in the middle, and exposed aggregate towards the upper end. The table below shows indicative installed driveway rates rather than the raw price of concrete alone.
Indicative 2026 price ranges by finish
Published 2026 supplied-and-laid ranges of the kind you'll see quoted across the Sunshine Coast, shown source by source so you can see exactly where each figure comes from. These are indicative market figures to help you read a quote, not a price from us. Every job needs a site visit.
| Finish or extra | What's the Damage Sunshine Coast, October 2026, incl. GST |
hipages national, updated 6 January 2026 |
ConConnect national, updated August 2026 |
TradieVerify published 18 March 2026 |
|---|---|---|---|---|
| Plain grey | $73 to $145 (typical $105) | $65 to $85 | $60 to $85 | $60 to $80 (Queensland) |
| Coloured (through-colour) | $92 to $195 (typical $135) | $75 to $95 | $75 to $110 | $75 to $100 (national) |
| Exposed aggregate | $115 to $195 (typical $155) | $100 to $150 | $100 to $150 | $95 to $140 (Queensland) |
| Stencilled or stamped | $115 to $195 (typical $150) | $100 to $150 | $120 to $180 (stamped) | $100 to $200 (national) |
| Removing an old driveway | $29 to $97 incl. disposal (typical $58) | Not given | $30 to $80 | $20 to $50 (national) |
| Sealing | Not given | $10 to $35 (sealing guide, updated 27 January 2026) | $10 to $30 | $5 to $15 (finishing and sealing, national) |
How to read this table: each column shows that source's own published range on the date shown. Only What's the Damage is specific to the Sunshine Coast, and only it states that its prices include GST; its per-m² rows cover plain slabs and outdoor concrete work generally. hipages, ConConnect and TradieVerify are national guides, and TradieVerify's plain and exposed aggregate figures are its Queensland rows. hipages describes some decorative rates as on top of the concrete cost, so its decorative figures may not be like for like. Sources also differ on whether base preparation and removal are included. Published ranges differ materially by scope, location and inclusions, so these figures are a market guide, not a quote or a guaranteed rate.
Sunshine Coast pricing sits broadly in line with the wider South East Queensland metro market, so a driveway here is not dramatically dearer than one at Brisbane or Ipswich. What tends to push a local quote is the ground. Acid sulfate soils on the river flats and canal estates, and reactive clay and basalt up in the Blackall Range hinterland, both call for more attention to the base and to steel protection, and sloped hinterland blocks add access and concrete-pump cost. A flat, sheltered block on stable ground near the coast is the cheapest kind of driveway to lay; a steep Buderim or Nambour block, or a low Pelican Waters canal block, is not.
Research note: figures were rechecked against each live source page on 12 October 2026. Earlier versions of this guide showed a single blended range for each finish; that has been replaced with each source's own published figures so you can see where every number comes from. Rawlinsons' paid construction cost guide was not used.
What a typical Sunshine Coast driveway costs: worked examples
To turn a per-square-metre rate into a budget, multiply the area by the rate. The examples below do exactly that using one source for the driveway itself: What's the Damage's October 2026 Sunshine Coast ranges of $73 to $145 per m² for plain concrete, $115 to $195 for exposed aggregate and $29 to $97 for removing old concrete. What's the Damage does not publish a sealing rate, so the sealing column uses hipages' national $10 to $35 per m² (January 2026). This is our arithmetic on published figures, not a quote.
| Driveway | Area | Plain concrete (area x $73 to $145) |
Exposed aggregate (area x $115 to $195) |
Add: remove old driveway (area x $29 to $97) |
Add: seal (area x $10 to $35) |
|---|---|---|---|---|---|
| Single, 3 m x 6 m | 18 m² | $1,314 to $2,610 | $2,070 to $3,510 | $522 to $1,746 | $180 to $630* |
| Double | 50 m² | $3,650 to $7,250 | $5,750 to $9,750 | $1,450 to $4,850 | $500 to $1,750 |
| Long or rural | 100 m² | $7,300 to $14,500 | $11,500 to $19,500 | $2,900 to $9,700 | $1,000 to $3,500 |
Area multiplied by the published per-m² range. Excludes crossover work, drainage, retaining, pumping and anything unusual about your block. *Small sealing jobs often hit a minimum charge: ConConnect (August 2026) says most sealing operators have a minimum call-out of $400 to $600.
Single driveway (about 3 m x 6 m, 18 m²)
A 3 m wide single driveway 6 m long is 18 m². At What's the Damage's Sunshine Coast rates that is about $1,314 to $2,610 in plain concrete or $2,070 to $3,510 in exposed aggregate. The national guides sit lower: hipages prices the same 18 m² from about $2,600 on a flat block or $2,800 on a slope, and ConConnect puts it at $1,100 to $1,550 in plain concrete. TradieVerify notes that larger driveways cost less per square metre, so a short driveway tends to land higher in any range.
Double driveway (about 50 m²)
ConConnect describes a double driveway as 5.5 to 6 m wide, and around 50 m² is typical. At What's the Damage's rates that is about $3,650 to $7,250 plain or $5,750 to $9,750 in exposed aggregate. For comparison, What's the Damage's own published total for a plain driveway of about 40 m² is $2,525 to $5,800, or $4,650 to $8,750 in exposed aggregate, and ConConnect's national figures for 50 m² are $3,000 to $4,250 plain and $5,000 to $7,500 exposed aggregate.
Long or rural driveway (about 100 m²)
A 100 m² run, such as a long hinterland driveway, works out at about $7,300 to $14,500 plain or $11,500 to $19,500 in exposed aggregate at the same rates. ConConnect's national figures for 100 m² are $6,000 to $8,500 plain and $10,000 to $15,000 exposed aggregate. If there is no kerb and channel where the driveway meets the road, Sunshine Coast Council expects its rural driveway design for the crossover; see the council section below.
Removing the old driveway first
Replacing a driveway adds removal. What's the Damage lists stand-alone concrete removal on the Sunshine Coast at $29 to $97 per m² including disposal, so taking out an old 50 m² driveway adds roughly $1,450 to $4,850 before the new slab goes in. ConConnect's national range is $30 to $80 per m². Sealing can be added once the new slab has cured; see the sealing costs further down.
Pricing a shed or garage pad instead? A kit-set double garage pad, such as 6 m x 7 m (42 m²), is a slab rather than a driveway and is designed and priced differently. See our guide to a concrete slab for a shed or garage.
Once you have a budget in mind, our concrete driveway installation on the Sunshine Coast page explains how a new or replacement driveway goes in and how to arrange a site quote.
What actually drives the price
These are the things that move a driveway quote on the Coast, roughly in the order they matter:
- Area and shape. Square metres set the baseline. Curves, garden beds and awkward edges slow the formwork down and add labour.
- Demolition. Breaking out an old slab and carting it away is a real cost, and an old driveway with steel through it takes longer to remove. What's the Damage lists stand-alone removal on the Sunshine Coast at $29 to $97 per m² including disposal (October 2026).
- Ground conditions. Loose coastal sand, deep red Buderim volcanic soil, reactive Blackall Range clay and acid sulfate river-flat ground each need their own base treatment. This is the biggest single reason two quotes differ. ConConnect puts site preparation (excavation, fill and formwork) at $20 to $50 per m² (August 2026).
- Drainage. Low blocks near the Maroochy and Mooloolah rivers and the Pelican Waters canals often need extra work to keep water out of the base.
- Access and slope. Steep or tight blocks around Buderim, Nambour and Montville decide whether the concrete gets pumped or barrowed, and that changes the labour on the day. hipages puts a sloping driveway at about $10 per m² more than a flat one (January 2026), and TradieVerify puts a concrete pump at $300 to $800 per session (March 2026).
- Thickness and steel. Heavier loads and poor ground need more of both, and acid sulfate ground needs corrosion-aware cover over the steel. TradieVerify puts stepping up to 125 to 150 mm with heavier mesh at about $10 to $25 extra per m² (March 2026).
- Finish. Plain, coloured, stencilled or exposed aggregate all sit at different points, as the table above shows.
- Weather and timing. Rain can push a pour back, so it pays to plan around the wet season. See the best time to pour concrete on the Coast before you lock in a date.
- The council crossing. The vehicular crossing at the kerb is priced separately. A standard crossover that passes Sunshine Coast Council's checklist needs no permit; a non-standard one needs council sign-off, and fees apply.
How to compare concrete driveway prices
A square-metre rate only helps when every quote covers the same job. Before comparing the final number, check whether each written quote includes:
- Excavation, demolition and disposal of the existing surface or unsuitable soil.
- The specified base preparation, slab thickness, concrete strength and reinforcement.
- Formwork, pumping or difficult-access labour, plus the chosen surface finish and sealer.
- Drainage, control joints and curing, especially on sloping or low-lying Coast blocks.
- GST, permits and the vehicular crossing, or a clear note showing which items are separate.
Match the scope first and then compare the total. A lower concrete price can become the dearer driveway if base preparation, removal, pumping or council work appears later as an extra.
Check the licence. In Queensland, building work valued over $3,300 needs a QBCC licence (QBCC, page last reviewed 16 April 2026), and many driveway jobs come in above that figure. Ask any concreter quoting your driveway for their QBCC licence number and check it before you sign. The concreting provider is responsible for its own licence, insurance and workmanship.
Why the Sunshine Coast ground moves the number
The Coast hands concreters a wide spread of ground, and the ground is where a cheap quote and an honest one part ways. Down on the low river flats and canal estates near the Maroochy River, the Mooloolah River and Pelican Waters you often hit acid sulfate soils, where acidic groundwater attacks reinforcing steel unless the slab has proper cover and a mix chosen with that in mind. Back in the Blackall Range hinterland behind Nambour, Palmwoods and Maleny the reactive clay and basalt swell when wet and shrink when dry, which is hard on an under-built slab. Up on Buderim the deep red volcanic soil behaves differently again, and along the beaches the loose sand drains fast but has to be confined and compacted so it does not spread under a car.
None of that is exotic and none of it should scare you off. It simply means a quote that accounts for your actual ground will sometimes be higher than one that assumes a flat, stable block, and the higher quote is often the one that lasts. For the full picture of why slabs fail here, see our guide on why concrete cracks on the Sunshine Coast and how to prevent it.
Reading the finish into the price
Most of the range in the table comes down to the finish you pick, so it pays to know what you are actually buying. A plain concrete driveway is the cheapest and does the job on a sheltered flat block. Exposed aggregate costs more but grips better on wet, sloped driveways and around pools, and a lighter stone stays cooler underfoot in the Coast heat, which is why it is so common here. Coloured and stencilled decorative finishes sit in between. If you already have a sound slab that just looks tired, resurfacing can be cheaper than a full replacement and is worth pricing before you rip anything up. For a side-by-side look at the trade-offs, see exposed aggregate vs plain concrete.
Driveway sealing costs
We could not find a published Sunshine Coast sealing rate, so the figures here are national. hipages' driveway sealing guide (updated 27 January 2026) puts sealing at $10 to $35 per m²: about $25 to $35 for plain concrete and $10 to $20 for exposed aggregate. Its size guide gives about $600 to $1,050 for a single driveway up to 30 m², $1,000 to $1,750 for a double up to 50 m² and $2,000 to $3,500 for driveways up to 100 m². ConConnect (August 2026) gives $10 to $30 per m² and notes most sealing operators have a minimum call-out of $400 to $600.
Sealing a 200 m² driveway: at hipages' $10 to $35 per m², that works out at roughly $2,000 to $7,000 (200 x $10 and 200 x $35), before any repairs. hipages notes that professional pressure cleaning can add about $40 to $60 per hour.
- How often. hipages says most sealers need redoing every two to five years; ConConnect suggests resealing exposed aggregate every two to three years.
- Steep driveways. Cement Concrete & Aggregates Australia (CCAA) warns that sealers which form a film on the surface can reduce slip and skid resistance on steep driveways, and recommends penetrating or slip-resistant sealers for steeper grades. That matters on sloping hinterland blocks.
- No council approval. Sunshine Coast Council says basic maintenance such as sealing or repairing cracks does not need council approval, and that includes the crossover.
If the surface is worn rather than just dull, compare the cost of concrete resurfacing before you reseal or replace.
Sunshine Coast Council driveway and crossover rules
The crossover is the part of your driveway that crosses the verge, from the kerb or road edge to your property boundary. It sits on council-controlled land, so Sunshine Coast Council's driveway rules apply to it. This is what council's own page and fact sheets say, as checked on 12 October 2026. Council documents change, so check the current versions before work starts. In the Noosa Shire, Noosa Council is a separate council with its own crossover requirements.
- Standard crossover: no permit. Council's crossover checklist (dated 1 September 2026) lets you self-assess your plans. If you can answer yes to every question, the crossover is standard and you can start construction without a permit.
- Non-standard crossover: approval first. If any answer is no, the crossover is non-standard and you may need an operational works application or other council approval. Fees apply to operational works and vehicle access applications, and construction must not start until you have council's final approval notice. Changing an existing crossover's profile, surface, dimensions or materials to something non-standard counts too.
- The owner builds, pays and maintains. Council does not build crossovers for private property access. The property owner is responsible for building and maintaining the crossover, including any change to the kerb and channel and the associated drainage, and can build it themselves or engage a licensed contractor (construction and maintenance fact sheet).
- Maintenance needs no approval. Repairing cracks or sealing your driveway or crossover does not need council approval.
- State-controlled roads. If your access is off a state-controlled road, approval comes from the Department of Transport and Main Roads, not council.
- Getting it wrong. Work that does not meet the self-assessable specifications is unauthorised and can attract penalties under section 75 of the Local Government Act 2009 (standard crossover process fact sheet, 1 July 2026).
What the checklist asks
These are some of the checklist questions that most often decide whether a crossover is standard:
- Is it at least 1.0 m clear of the nearest stormwater pit or traffic calming device, and at least 1.0 m clear of the nearest power pole?
- Is it clear of water meters, fire hydrants and valves, Telstra or NBN pits, and sewerage or stormwater manholes?
- Is it outside 10 m of the approach side of a bus stop?
- For a residential crossover, is it less than 25 m long within the road reserve (less than 45 m for a rural crossover)?
- Does it avoid raised edges, such as raised-pattern stamped concrete?
- Will its levels match any existing concrete footpath?
The checklist also covers materials, width, grade, prohibited locations, parking bays, easements and corner blocks, so work through the whole thing with your concreter before the quote is final. If there is no kerb and channel where the driveway meets the road, council's rural driveway design (standard drawing RS-056) applies.
Steel, concrete and cover in the crossover
Council has adopted the Institute of Public Works Engineering Australasia Queensland (IPWEA-QNT) residential driveway drawings, including RSD-101 Revision A, with no Sunshine Coast addendum listed (council's standard drawings index). The notes on RSD-101 Revision A (07/23, copy hosted by Logan City Council) call for:
- SL72 reinforcing fabric as a minimum
- N32 concrete as a minimum
- 50 mm of top and edge cover to the fabric
- a heavy broom finish on plain concrete
- a high point 250 mm above the kerb invert, so road stormwater stays in the road reserve
N32 is a higher concrete grade than the N20 that CCAA describes as satisfactory for typical home driveways, so the crossover part of a quote may be specified differently from the slab on your land. Council's crossover application fees are not listed in the documents we checked, so ask council directly if your crossover is non-standard.
How thick should a driveway be, and does it change the price?
CCAA's data sheet Residential Concrete Driveways and Paths (December 2017 edition) gives these minimum thicknesses for home pavements:
- 100 mm for vehicles under 3 tonnes gross mass.
- 150 mm for vehicles between 3 and 10 tonnes. Anything heavier needs an engineer's design.
- 75 mm for foot traffic only, such as paths and patios.
For a 100 mm pavement, CCAA's table gives one layer of SL72 mesh as the minimum for minor crack control (SL102 for moderate crack control) and control joints at no more than 3 m centres. It describes N20 concrete as satisfactory for most home driveways, with higher grades for heavier vehicles or saline soils. It also recommends curing for at least 3 days, extended to 7 days within 1 km of the coast, which matters for beachside suburbs.
On price, TradieVerify (March 2026) puts stepping up to 125 to 150 mm with heavier mesh at about $10 to $25 extra per m², and ConConnect (August 2026) puts upgrading from SL72 to SL82 mesh at roughly $10 per m². Curing also decides when you can use the driveway; see how long before you can drive on new concrete.
Concrete vs pavers vs asphalt: published price ranges
ConConnect's national guide (August 2026) puts installed asphalt at $25 to $100 per m² (typically around $60) and pavers at $70 to $160, against $60 to $150 for concrete. It rates concrete's lifespan at 30 to 40 years, asphalt's at 15 to 20 and pavers' at 30 years or more. TradieVerify (March 2026) gives asphalt at $25 to $50 per m² and clay or concrete pavers at $80 to $150. So asphalt is usually cheaper up front, while concrete tends to last longer.
The choice is about more than price, so see our guide to concrete vs pavers for a driveway. If you are considering a material other than concrete for the crossover, check it against council's current crossover checklist first.
Laid price vs the price of concrete itself
Search for concrete prices and you will see two kinds of number. Everything above is for a driveway supplied and laid. Ready-mix concrete on its own is sold by the cubic metre: What's the Damage lists 25 MPa ready-mix delivered on the Sunshine Coast at $290 to $465 per m³, supply only (October 2026). A 100 mm slab uses about 0.1 m³ of concrete per m², so at those rates the concrete itself accounts for roughly $29 to $47 of each square metre, before wastage or part-load charges. The rest of a laid price is labour, base preparation, formwork, steel, finishing and, where needed, removal and pumping.
Are prices going up in 2026?
The Australian Bureau of Statistics' Producer Price Indexes for the June quarter 2026 (released 31 July 2026) show output prices for building construction up 4.9% over the twelve months to June 2026. That is a national figure for building construction as a whole, not a driveway or Sunshine Coast index, but it is a fair sign that costs have not been standing still. When you get a written quote, check how long the price holds and what happens if the job is delayed.
Get a fixed-price quote
The only way to turn these ranges into a real number is a site visit. Tell us your suburb, the rough size and what finish you are after, and we will get a local concreter out to look at the ground and the access and price the job properly. There is no cost and no obligation.
Call 0482 392 415 or send the details through the contact page and we will be in touch.
You can also start with our Sunshine Coast driveway installation and quote service.
FAQs
How much does a concrete driveway cost on the Sunshine Coast?
As an indicative guide, published ranges for plain grey concrete supplied and laid across the Sunshine Coast run roughly $73 to $145 per square metre (What's the Damage, October 2026, GST included), with coloured, stencilled and exposed aggregate finishes sitting higher. Those are published market figures to help you read a quote, not a price from us. Every driveway needs a site visit before anyone can give you a real number.
Why are two quotes for the same size driveway so different?
Square metres set a baseline, but ground conditions, demolition, drainage, access and finish move the number a long way. A driveway on reactive Blackall Range clay or an acid sulfate river-flat block needs more base and steel protection than a flat sheltered block, so an honest quote for harder ground lands higher.
Does the council crossing add to the cost?
Yes. The vehicular crossing where your driveway meets the road is Sunshine Coast Council territory (Noosa Council in the Noosa Shire) and gets priced separately. On the Sunshine Coast, a standard crossover that passes council's checklist needs no permit, but a non-standard one needs council approval and fees apply. If you are putting in a new crossing or widening one, budget for it and sort out early whether it is standard or needs approval.
Is exposed aggregate worth the extra cost here?
Many Coast homeowners think so. Exposed aggregate grips better on wet subtropical driveways and around pools, a lighter stone stays cooler underfoot in the heat, and it suits the coastal look. It costs more than plain grey but the same base has to go in underneath either way.
How much does it cost to seal a concrete driveway on the Sunshine Coast?
Published sealing rates are national rather than local. hipages' guide (updated January 2026) puts driveway sealing at about $10 to $35 per square metre, or $1,000 to $1,750 for a double driveway up to 50 m², with exposed aggregate at the lower end per square metre. Most sealers need redoing every two to five years.
What does a double concrete driveway cost?
Using What's the Damage's October 2026 Sunshine Coast rates, a 50 m² double driveway works out at roughly $3,650 to $7,250 in plain concrete and $5,750 to $9,750 in exposed aggregate, before removing an old driveway or any crossover work. That is the area multiplied by the published per-square-metre range, not a quote.
How much does it cost to remove an old concrete driveway?
What's the Damage lists stand-alone concrete removal on the Sunshine Coast at $29 to $97 per square metre including disposal (October 2026). On a 50 m² driveway that works out at roughly $1,450 to $4,850 before the new slab goes in.
How thick should a concrete driveway be?
Cement Concrete & Aggregates Australia recommends a minimum of 100 mm for vehicles under 3 tonnes and 150 mm for vehicles between 3 and 10 tonnes, with one layer of SL72 mesh as the minimum for minor crack control in a 100 mm slab. Within 1 km of the coast it recommends curing for at least seven days.
Is asphalt cheaper than concrete for a driveway?
Usually, up front. ConConnect's 2026 guide puts installed asphalt at about $25 to $100 per square metre against $60 to $150 for concrete, but rates concrete's lifespan at 30 to 40 years against 15 to 20 for asphalt.
What steel and concrete does council want in a driveway crossover?
Sunshine Coast Council has adopted the IPWEA-QNT residential driveway drawing RSD-101 (Revision A), which calls for SL72 reinforcing fabric as a minimum, N32 concrete as a minimum and 50 mm of top and edge cover to the fabric. Check the current drawing and council's crossover checklist before work starts.